Auzef Modern Üretim Sistemleri 2025-2026 Bütünleme Soruları
https://lolonolo.com/2026/10/01/modern-uretim-sistemleri-2025-2026-butunleme-sorulari/
auzef, İşletme, Modern Üretim Sistemleri
Show More Show Less View Video Transcript
0:00
Welcome to the Lolonolo platform. In
0:02
this lesson, we will dive deep into
0:05
modern production systems for 2025-2026
0:07
, past exam questions, and detailed
0:09
explanations. Yes, we are starting with
0:11
great energy. Because frankly, this
0:14
lecture will be a lifesaver for you to
0:16
ace the exam. Sit back, focus your
0:18
attention, and let's get started right
0:20
away. Our roadmap for today is quite
0:22
clear. Part one is classical and modern
0:24
systems. Part two is the Toyota system
0:26
and those famous wastes. 3. Quality and
0:29
6 Sigma, 4. Flexible manufacturing and
0:31
line balancing, 5. ERP and MRP, and
0:34
finally 6. Supply and distribution.
0:36
Let's quickly go through them and dive
0:38
into the main subject. Alright. We are
0:40
starting with Module 1. Classical and
0:41
modern production systems. Let's lay
0:43
the foundations. Now, the distinction
0:45
between classical systems and modern
0:47
systems. Look, this is not just some
0:49
boring historical background
0:51
information. This is a massive exam
0:53
trap. Classical systems work
0:55
continuously on a batch or project
0:56
basis and generally proceed with a push
0:58
logic. Meaning, the logic of "produce
1:00
and set aside." But modern systems,
1:02
they are much more agile, much smarter.
1:05
Lean manufacturing, just-in-time
1:07
production, and flexible systems are
1:08
all under this modern umbrella. So, if
1:11
you see lean production in the options,
1:12
don't say, "Oh dear, this existed back
1:14
then too." It is definitely a modern
1:16
approach. Don't fall for the trap.
1:18
Before we continue, we need to engrave
1:20
these two fundamental concepts into our
1:22
minds. Process. Everything that takes
1:25
inputs and converts them into outputs
1:27
in a specific planned order, and of
1:28
course, that magic word. Kaizen, or
1:30
continuous improvement through small
1:33
steps. Do you know what Kaizen is all
1:35
about? It doesn't look for
1:36
billion-dollar massive innovations. It
1:38
focuses on how small, everyday
1:39
improvements combine over time to
1:41
create a massive wave of productivity.
1:43
Honestly, the heartbeat of the major
1:45
systems we'll discuss in a moment is
1:47
hidden exactly in these two words. So,
1:49
let's come to Module 2. Toyota
1:51
production system and those famous 7
1:53
wastes. Things are getting a bit more
1:55
interesting here. When you hear the
1:56
term supermarket, think of the
1:58
neighborhood grocery store you stop by
1:59
in the evening. In fact, when Taiichi
2:01
Ohno was setting up this system, he was
2:03
incredibly influenced by the shelf
2:04
replenishment logic of supermarkets in
2:06
America. Think about it, the customer
2:08
only takes what they need. The store
2:10
clerk only refills the shelf by the
2:12
amount that is missing. There are no
2:13
mountains of stock piled up in the back
2:15
waiting to rot. That is exactly what a
2:17
supermarket in production is. It is a
2:19
highly controlled, smart area where
2:21
only the necessary amount of stock is
2:23
kept to feed the next process. But who
2:25
tells the machines when this
2:27
supermarket needs to be filled? This is
2:29
exactly where Kanban enters the scene.
2:31
Kanban means card or signal in Japanese
2:34
. It is the critical communication
2:35
signal that actually manages the pull
2:37
flow in the supermarket, shouting, "Hey
2:39
, parts are out here, produce new ones
2:41
immediately." In other words, if that
2:42
card or signal isn't there, the system
2:44
won't even lift a finger. Everything
2:46
depends on this signal. There are seven
2:48
main wastes that Toyota is sworn to
2:50
eliminate, so to speak. These are
2:52
overproduction, waiting, transport,
2:54
unnecessary processing, inventory,
2:56
unnecessary motion, and of course,
2:58
defective production. But I have a very
3:00
, very high-level warning for you here.
3:03
If it comes up on the exam, employees
3:05
are never, ever a type of waste. On the
3:07
contrary, they are your most valuable
3:09
resource to find and eliminate this
3:10
waste. Also, a small note. Short
3:12
preparation times, or what we know as
3:14
setup operations, do not cause waste.
3:16
On the contrary, they significantly
3:17
reduce waste. Write this down in a
3:19
corner, too. Moving on to module 3.
3:21
Quality management and 6 Sigma. We are
3:24
setting aside waste and focusing on
3:25
quality. Now, matching these founding
3:28
fathers of the quality world with their
3:30
legendary theories. Look, these
3:32
pairings are a real gold mine that is
3:34
guaranteed to appear on the exam. Do
3:36
you know what the most striking part is
3:37
? As quality increases, stocks decrease
3:40
. This is a very counterintuitive logic
3:41
, but it is definitely like that. Know
3:43
these names like the back of your hand.
3:44
Philip Crosby says zero defects. When
3:46
we say Edward Deming, the PDCA cycle
3:48
should immediately come to mind. Joseph
3:50
Juran is the architect of that famous
3:51
quality trilogy. Kaoru Ishikawa is the
3:53
inventor of the fishbone diagram that
3:55
we all know. And Armand Feigenbaum
3:57
gifted the concept of total quality
3:59
control to the literature. Etch these
4:01
into your mind. 6. If you ask what the
4:05
ultimate goal that Sigma is
4:06
mathematically trying to reach is, hold
4:08
tight: only 3.4 defects in 1 million
4:10
opportunities. Can you imagine? You
4:14
bring the variability in processes
4:15
under such tight control that you are
4:17
virtually brushing against perfection.
4:18
But there is a very dangerous exam trap
4:20
here. Please be careful. They will ask
4:22
you about the benefits of 6 Sigma.
4:24
Extending or increasing cycle time is
4:26
never, and I mean never, a 6 Sigma
4:28
benefit. Why would we slow down when we
4:30
could speed up? Right? So how do they
4:33
reach this perfection? This system,
4:35
which was born at Motorola and took the
4:37
world by storm with General Electric,
4:39
manages projects with the DMAIC cycle.
4:41
The steps are so logical: first define
4:43
the problem, then measure the current
4:45
state, analyze the root causes, improve
4:47
the system, and the most crucial point,
4:50
control it so the gains don't fly away.
4:52
Here is your step-by-step recipe for
4:54
excellence. Without slowing down,
4:57
module 4: flexible manufacturing
4:59
systems, or FMS, and line balancing.
5:01
Now we are looking a bit more at the
5:02
machine and system side of things.
5:04
Don't just brush off flexibility in
5:05
production. It has sub-breakdowns, and
5:07
each represents a very different power.
5:09
Production flexibility is related to
5:10
the investment dimension of the
5:11
business. Product flexibility shows how
5:13
quickly you adapt to new products when
5:14
the market changes suddenly. Route
5:16
flexibility saves lives. Did a machine
5:18
break down? No problem at all. You run
5:19
the work through another machine.
5:21
Process flexibility is the ability to
5:22
perform different operations without
5:24
ever changing machine settings. But
5:25
every beauty has a flaw, of course.
5:27
These systems have disadvantages like
5:28
very high investment costs or software
5:30
issues that drive you crazy. Still,
5:32
remember that these complex systems do
5:33
not distance the business from
5:35
technology. On the contrary, it places
5:36
the business right at the heart, the
5:38
very center of technology. When it
5:40
comes to line balancing, another
5:41
popular method you will encounter is
5:42
the positional weight method. It might
5:44
sound a bit academic and complex, but
5:46
believe me, the logic is very simple.
5:47
Are you going to find the weight of a
5:49
job? You take its own duration. You add
5:51
the durations of all the jobs that come
5:52
after that job on top of it. And there
5:54
you go, it's done. But let me give you
5:55
a very, very important tip. When this
5:57
question comes up in the exam, don't
5:59
just dive headfirst into calculations.
6:00
Who comes after whom first? What is the
6:03
precedence relationship? To see this,
6:04
draw that workflow diagram on paper.
6:07
It’s a lifesaver. Take my word for it
6:08
. Yes, we’ve arrived at Module 5. ERP
6:11
, MRP, and ordering methods. We are
6:14
entering the digital brain of the
6:16
business. Enterprise Resource Planning,
6:18
or ERP for short. Think about it,
6:20
finance, HR, production, sales—aren't
6:22
they all departments playing to
6:23
different tunes? Well, ERP takes them
6:25
and combines them into a single
6:27
integrated system in perfect harmony.
6:29
In Turkey, we generally see popular
6:31
packages like SAP, Logo, IFS, and
6:33
Teknasol. Now, sit back and listen to
6:35
the exam committee’s favorite trap.
6:38
If you see the name KPMG among the
6:39
options, please, by all means, do not
6:41
mark it. KPMG is a global audit and
6:43
consulting giant. It is not an ERP
6:45
software or anything like that. Many
6:46
people fall into this trap; don't be
6:48
one of them. And the famous EOQ, or
6:50
Economic Order Quantity formula. Most
6:52
people try to memorize this square-root
6:54
formula by rote. However, the most
6:56
vital point here is to grasp the
6:58
delicate balancing act behind it. This
7:00
formula is actually like a seesaw. On
7:03
one side, you have your ordering costs.
7:05
On the other, the cost of holding those
7:06
goods in the warehouse. If you order
7:08
too much, your storage costs go through
7:10
the roof. If you order too little, your
7:12
shipping and transport costs skyrocket.
7:15
So, this formula finds that sweet spot
7:17
where both costs are balanced. Neither
7:20
too little nor too much. And finally,
7:22
our last stop. Module 6, supply network
7:25
and distribution planning. We are
7:27
looking at how all these internal
7:28
systems connect to the outside world.
7:31
There are two main actors in
7:32
distribution planning, and they move in
7:34
completely opposite directions. In the
7:36
pull method, the action starts where
7:38
demand is born—at the final store.
7:40
You plan from the store to the regional
7:42
warehouse, and from there to the
7:43
factory. Demand literally pulls the
7:45
product along the chain, but in the
7:47
push method, things turn completely
7:49
around. First, the factory produces
7:51
frantically. It sends it to the
7:52
regional warehouse. And from there, it
7:54
literally pushes the product toward the
7:55
store. If you lock into your mind that
7:58
the directions are 100%opposite,
7:59
you’ve got this. That’s all there
8:01
is to it. We have deciphered the entire
8:03
backbone of the exam and its sneaky
8:05
traps together. Burn those concepts of
8:07
waste and quality pioneers into your
8:08
mind. And instead of memorizing
8:10
formulas, as we always say, embrace
8:11
their logic. To solve the past exam
8:14
questions for this course and year in a
8:16
mock exam format, cover your gaps, and
8:19
test yourself in detail, you can visit
8:21
lolonolo.com or click the link in the
8:23
description below the video. Wishing
8:26
you infinite success in the exam.